Optimal Planning of Utility Relocations and Noise Barrier Approvals for Roadway Construction Projects
Optimal Planning of Utility Relocations and Noise Barrier Approvals for Roadway Construction Projects
Detailed Information
- 자료유형
- 학위논문 서양
- 최종처리일시
- 20260202105700
- ISBN
- 9798263307714
- DDC
- 385
- 서명/저자
- Optimal Planning of Utility Relocations and Noise Barrier Approvals for Roadway Construction Projects
- 발행사항
- [Sl] : University of Illinois at Urbana-Champaign, 2024
- 발행사항
- Ann Arbor : ProQuest Dissertations & Theses, 2024
- 형태사항
- 257 p
- 주기사항
- Source: Dissertations Abstracts International, Volume: 87-05, Section: A.
- 주기사항
- Advisor: El-Rayes, Khaled A.
- 학위논문주기
- Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2024.
- 초록/해제
- 요약Roadway projects are often delayed by several pre-construction tasks such as planning utility relocations and noise barrier approvals. Utility relocation was reported by 42 states to cause delays in their federal-aid highway and bridge projects. To mitigate these delays, the Federal Highway Administration (FHWA) and several state Departments of Transportation (DOT) reported the use of a wide range of practices to expedite utility relocations on roadway projects. Similarly, the use of new noise barrier designs and materials need approvals to ensure compliance with state DOT requirements including noise transmission loss, noise reduction coefficient, crash testing, and material degradation. State DOTs have reported that the review and approval process of these alternative designs and materials of roadway noise barriers by related bureaus can take up to three years. Accordingly, FHWA and state DOT officials are often confronted with critical challenges during the planning of roadway construction, including how to optimize the planning of utility relocations to minimize roadway project duration and cost; and how to expedite the review and approval of alternative designs and materials of roadway noise barriers to avoid costly delays. The main goal of this research study is to develop robust methodology for optimal planning of utility relocations and noise barrier approvals for roadway construction projects. To accomplish this goal, the research objectives of this study are to (1) perform a survey of state DOTs and utility companies to gather and analyze their procedures for planning roadway utility relocation projects; (2) develop a decision support tool to enable state DOTs to evaluate and rank all feasible utility relocation best management practices (BMPs) based on their cost-benefit and overall performance; (3) create a novel model to optimize the selection of utility relocation BMPs to minimize roadway project duration and cost; and (4) develop a robust procedure for approving new types of roadway noise barrier materials. The performance of the developed decision support tools and optimization models were analyzed using case studies of roadway construction projects. The results of this analysis illustrate the novelty of the developed tools and models and their unique capabilities. This is expected to provide state DOTs and construction planners with much needed support to minimize the duration of roadway projects and their related traffic delays and congestions; and expedite the approval process of new noise barrier designs and materials for roadway projects.
- 일반주제명
- Transportation
- 키워드
- Optimization
- 기타저자
- University of Illinois at Urbana-Champaign Civil & Environmental Eng
- 기본자료저록
- Dissertations Abstracts International. 87-05A.
- 전자적 위치 및 접속
- 로그인 후 원문을 볼 수 있습니다.
MARC
008260126s2024 us c eng d■001000017361063
■00520260202105700
■006m o d
■007cr#unu||||||||
■020 ▼a9798263307714
■035 ▼a(MiAaPQ)AAI32409851
■035 ▼a(MiAaPQ)124407
■040 ▼aMiAaPQ▼cMiAaPQ
■0820 ▼a385
■1001 ▼aIgnacio, Ernest-John Domingo.
■24510▼aOptimal Planning of Utility Relocations and Noise Barrier Approvals for Roadway Construction Projects
■260 ▼a[Sl]▼bUniversity of Illinois at Urbana-Champaign▼c2024
■260 1▼aAnn Arbor▼bProQuest Dissertations & Theses▼c2024
■300 ▼a257 p
■500 ▼aSource: Dissertations Abstracts International, Volume: 87-05, Section: A.
■500 ▼aAdvisor: El-Rayes, Khaled A.
■5021 ▼aThesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2024.
■520 ▼aRoadway projects are often delayed by several pre-construction tasks such as planning utility relocations and noise barrier approvals. Utility relocation was reported by 42 states to cause delays in their federal-aid highway and bridge projects. To mitigate these delays, the Federal Highway Administration (FHWA) and several state Departments of Transportation (DOT) reported the use of a wide range of practices to expedite utility relocations on roadway projects. Similarly, the use of new noise barrier designs and materials need approvals to ensure compliance with state DOT requirements including noise transmission loss, noise reduction coefficient, crash testing, and material degradation. State DOTs have reported that the review and approval process of these alternative designs and materials of roadway noise barriers by related bureaus can take up to three years. Accordingly, FHWA and state DOT officials are often confronted with critical challenges during the planning of roadway construction, including how to optimize the planning of utility relocations to minimize roadway project duration and cost; and how to expedite the review and approval of alternative designs and materials of roadway noise barriers to avoid costly delays. The main goal of this research study is to develop robust methodology for optimal planning of utility relocations and noise barrier approvals for roadway construction projects. To accomplish this goal, the research objectives of this study are to (1) perform a survey of state DOTs and utility companies to gather and analyze their procedures for planning roadway utility relocation projects; (2) develop a decision support tool to enable state DOTs to evaluate and rank all feasible utility relocation best management practices (BMPs) based on their cost-benefit and overall performance; (3) create a novel model to optimize the selection of utility relocation BMPs to minimize roadway project duration and cost; and (4) develop a robust procedure for approving new types of roadway noise barrier materials. The performance of the developed decision support tools and optimization models were analyzed using case studies of roadway construction projects. The results of this analysis illustrate the novelty of the developed tools and models and their unique capabilities. This is expected to provide state DOTs and construction planners with much needed support to minimize the duration of roadway projects and their related traffic delays and congestions; and expedite the approval process of new noise barrier designs and materials for roadway projects.
■590 ▼aSchool code: 0090.
■650 4▼aTransportation
■653 ▼aUtility relocations
■653 ▼aUtility adjustment
■653 ▼aRoadway construction
■653 ▼aOptimization
■653 ▼aNoise barrier approvals
■653 ▼aAlternative noise barriers
■690 ▼a0543
■690 ▼a0454
■690 ▼a0709
■71020▼aUniversity of Illinois at Urbana-Champaign▼bCivil & Environmental Eng.
■7730 ▼tDissertations Abstracts International▼g87-05A.
■790 ▼a0090
■791 ▼aPh.D.
■792 ▼a2024
■793 ▼aEnglish
■85640▼uhttp://www.riss.kr/pdu/ddodLink.do?id=T17361063▼nKERIS▼z이 자료의 원문은 한국교육학술정보원에서 제공합니다.
Preview
Export
ChatGPT Discussion
AI Recommended Related Books
Подробнее информация.
- Бронирование
- не существует
- моя папка
- Первый запрос зрения
- Non-Book Loan Application
- Nighttime Book Loan Application
Available after logging in.